PROJECT EVIDENCE
2028 Washington Avenue
Quick read: We confirmed 1 contractor connection through DOB records and the building’s BIN.
This is a supporting evidence page for contractor checks—not a complete property, ownership, violation or permit history.
WHY THIS PAGE EXISTS
2028 Washington Avenue is the address-level record connected to Erin Construction & Development.
Bronx · built 1928
- ✓Building identityBIN 2011471 · BBL 2030460003
- ✓Contractor connectionDOB job and contractor matched
- ✓Property profileNYC Planning record found
- –Landmark attributesNo LPC designation record found
BUILDING AND LOCATION
What official property records say about this building
- Location
- Bronx, 10457
- Construction
- 1928
- Building
- Property type not recorded · 6 floors · 34 residential units
- Architecture
- Not recorded
- Historic district
- No district recorded in the sources searched
- Official identifiers
- BIN 2011471 · BBL 2030460003
The embedded Google Map is disabled until you allow it in the privacy choices.
Open this address in Google Maps ↗Review privacy choicesWORK EVIDENCE
What connects the contractor to this address
These entries come from DOB work records under the researched contractor identity.
Erin Construction & Development
DOB-linked recordDOB scope: SUBSEQUENT FILING FOR MEP WORK FOR INTERIOR GUT RENOVATION OF EXISTING 6 STORY BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
- Job / permit
- 220307763
- Status and date
- SIGNED OFF · issued January 22, 2016
- Contractor in filing
- ERIN CONSTRUCTION & DEVELOPMENT CO., INC.
- Estimated filing cost
- $89,000
Show dataHide dataOfficial DOB permit record
Show dataHide dataDOB filing details
SOURCES AND LIMITATIONS
Where these facts came from
“Show data” displays the exact filtered rows here. Each preview also links to a plain-language dataset description and the original API response.
- Year, size, units, location and property identifiers.
Show dataHide dataNYC Planning PLUTO
- Official DOB address, job, contractor identity and license match.
Show dataHide dataErin Construction & Development contractor match
Not included: ownership due diligence, violations, litigation, every permit ever filed at the property, or work performed without a DOB filing. Last official property refresh: August 17, 2026.