WHY THIS PAGE EXISTS

71 Fifth Avenue is the address-level record connected to AARCO Contracting.

Flatiron District · built 1907 · Early-20th century Commercial

BUILDING AND LOCATION

What official property records say about this building

Location
Flatiron District, Manhattan, 10003
Construction
1906 - 1907 · architect Charles Volz (architect) Edwin Outwater (builder)
Building
Van Beuren Building · Store and Lofts · 11 floors
Architecture
Early-20th century Commercial · Limestone · Brick · Terra Cotta · Iron
Historic district
Ladies' Mile Historic District
Official identifiers
BIN 1016068 · BBL 1008420042

The embedded Google Map is disabled until you allow it in the privacy choices.

Open this address in Google Maps ↗Review privacy choices

WORK EVIDENCE

What connects the contractor to this address

These entries come from DOB work records under the researched contractor identity.

  1. AARCO Contracting

    DOB-linked record

    DOB scope: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

    Job / permit
    M00987417-I1 · M00987417-I1-SF
    Status and date
    Signed-off · issued January 9, 2024
    Contractor in filing
    AARCO CONTRACTING LLC · license 606716
    Estimated filing cost
    $9,000
    How to verify the company publicationOpen the company’s project page and confirm that it publishes 71 Fifth Avenue as its work. This verifies the company’s claim only; the DOB record above is the separate contractor connection.Open the company project page

SOURCES AND LIMITATIONS

Where these facts came from

“Show data” displays the exact filtered rows here. Each preview also links to a plain-language dataset description and the original API response.

How to verify it yourselfOpen Original JSON data for the filtered official record, or Show data to read it here. Compare the BIN, address, job or property identifiers, named business and dates with this building. The linked dataset page explains the fields. A company publication remains a separate claim until it is matched to an official record.

Not included: ownership due diligence, violations, litigation, every permit ever filed at the property, or work performed without a DOB filing. Last official property refresh: August 17, 2026.